PlummetFahad Al Mansoori

Supplier and terms

Chosen from the supplier record, and overtypeable line by line

Taken from the FX master. Fix it on the order if the bank gave a different rate.

What the supplier wants before production starts.

Peglar Valves Ltd quotes 210 days door to door.

The UK houses are ordered once each January and drawn down through the year (PU-04).

Lines

Pieces and cartons together, with the cubic metres each line adds

The lines on this purchase order, each with its cartons, cubic metres and value.
ItemPiecesCartonsUnit cost (GBP)CBMLine value (GBP)
Total00.0000.00
0 lines · £0.00 · AED 0.00 at 4.7215

Against the container

A planning aid on this form — the container itself is recorded on the shipment

Volume0.000 of 76.4 CBM · 0.0%
Weight0 of 26,460 kg · 0.0%

Volume is the binding constraint on this order. Open the load builder to work the fill up line by line.

Call-off tranches

An annual contract is placed once and drawn down through the year (PU-04)

The call-off schedule for this annual contract, with what has been drawn down against each tranche.
TrancheDueQuantity (pcs)Called off (pcs)
0 tranches · 0 pcs scheduled