Edit purchase order
Supplier and terms
Chosen from the supplier record, and overtypeable line by line
Taken from the FX master. Fix it on the order if the bank gave a different rate.
What the supplier wants before production starts.
Grohe Middle East FZE quotes 14 days door to door.
The UK houses are ordered once each January and drawn down through the year (PU-04).
Lines
Pieces and cartons together, with the cubic metres each line adds
| Item | Pieces | Cartons | Unit cost (AED) | CBM | Line value (AED) | |
|---|---|---|---|---|---|---|
| 4.951 | 1,474,352.50 | |||||
| 1.838 | 256,528.40 | |||||
| 3.248 | 715,966.50 | |||||
| 3.655 | 807,302.16 | |||||
| 4.076 | 279,154.92 | |||||
| 3.659 | 806,491.00 | |||||
| Total | 14,299 | 21.427 | 4,339,795.48 |
6 lines · AED 4,339,795.48 · AED 4,339,795.48 at 1.0000
Against the container
A planning aid on this form — the container itself is recorded on the shipment
Volume21.427 of 76.4 CBM · 28.0%
Weight15,980 of 26,460 kg · 60.4%
Weight is the binding constraint on this order. Open the load builder to work the fill up line by line.