Edit purchase order
Supplier and terms
Chosen from the supplier record, and overtypeable line by line
Taken from the FX master. Fix it on the order if the bank gave a different rate.
What the supplier wants before production starts.
Al Futtaim Building Supplies quotes 5 days door to door.
The UK houses are ordered once each January and drawn down through the year (PU-04).
Lines
Pieces and cartons together, with the cubic metres each line adds
| Item | Pieces | Cartons | Unit cost (AED) | CBM | Line value (AED) | |
|---|---|---|---|---|---|---|
| 0.675 | 297,356.50 | |||||
| 6.849 | 536,303.00 | |||||
| 4.067 | 886,266.72 | |||||
| 3.080 | 237,460.30 | |||||
| Total | 15,774 | 14.672 | 1,957,386.52 |
4 lines · AED 1,957,386.52 · AED 1,957,386.52 at 1.0000
Against the container
A planning aid on this form — the container itself is recorded on the shipment
Volume14.672 of 76.4 CBM · 19.2%
Weight3,493 of 26,460 kg · 13.2%
Volume is the binding constraint on this order. Open the load builder to work the fill up line by line.