PlummetFahad Al Mansoori

CUS-016 · Samir Haddad

From the FX rate master. Change it for this document only.

China production runs 120–150 days.

First 60 matches
The lines on this document, with quantity, unit price, discount and line net.
ItemQty pcsFloorCostUnit priceDisc %Line netMarginRemove
SAN-1038Kaiyuan Shower tray 50mm29 ctn$344.76$316.29$354,010.6135.2%
SAN-1039Hongtai Shower tray 63mm21 ctn$29.89$27.42$36,582.0021.3%
FIT-1052Yuhuan Tee equal 20mm5 ctn$209.81$192.49$35,598.7532.4%
PLB-1003Hongtai Ball valve 25mm8 ctn$97.66$89.60$12,200.1129.5%
BLD-1119Plummet Select Bonding primer 110mm11 ctn$404.83$371.40$106,093.2823.0%
Net of 5 lines$544,484.76
VAT — zero-rated export$0.00
Total$544,484.76
Margin at landed cost31.6% · $172,012.66

Zero-rated export — VAT is not charged, and the reason line prints on the document. AED equivalent at the rate shown: AED 1,999,620.28.

Cancel

Photos from Pexels