PlummetFahad Al Mansoori

CUS-029 · Samir Haddad

From the FX rate master. Change it for this document only.

China production runs 120–150 days.

First 60 matches
The lines on this document, with quantity, unit price, discount and line net.
ItemQty pcsFloorCostUnit priceDisc %Line netMarginRemove
PLB-1024Peglar Stop cock 15mm4 ctn$488.56$448.22$116,314.6422.9%
HDW-1079Grohe Cabinet hinge 25mm28 ctn$417.91$383.40$270,758.7120.7%
PLB-1012Peglar Pressure reducing valve 50mm14 ctn$10.68$9.80$2,125.2735.4%
HDW-1093Hongtai Bracket 110mm19 ctn$121.65$111.61$25,136.6815.6%
SAN-1047Plummet Select Concealed cistern 110mm13 ctn$235.67$216.21$68,825.4818.3%
HDW-1089Plummet Select Padlock 63mm24 ctn$177.42$162.77$34,629.1232.3%
SAN-1037Grohe Shower tray 40mm19 ctn$409.94$376.09$98,241.4027.3%
Net of 7 lines$616,031.30
VAT — zero-rated export$0.00
Total$616,031.30
Margin at landed cost22.4% · $137,994.82

Zero-rated export — VAT is not charged, and the reason line prints on the document. AED equivalent at the rate shown: AED 2,262,374.96.

Cancel

Photos from Pexels