QT-2026-0180 rev 2
Lines
7 lines · DAP · Local, standard-rated
| Item | Qty | Unit price | Disc % | Line net | Margin |
|---|---|---|---|---|---|
| HDW-1094 Yuhuan Anchor bolt 75mm | 108 9 ctn | AED 424.38 | — | AED 45,833.04 | 29.0% |
| HDW-1075 Hongtai Door closer 25mm | 225 9 ctn | AED 525.33 | — | AED 118,199.25 | 33.9% |
| PLB-1016 Yuhuan Float valve 50mm | 480 20 ctn | AED 490.81 | — | AED 235,588.80 | 28.0% |
| HDW-1089 Plummet Select Padlock 63mm | 150 25 ctn | AED 246.28 | — | AED 36,942.00 | 33.9% |
| BLD-1100 Yuhuan Tile grout 20mm | 375 15 ctn | AED 437.57 | — | AED 164,088.75 | 25.0% |
| PLB-1011 Plummet Select Pressure reducing valve 40mm | 192 16 ctn | AED 658.26 | — | AED 126,385.92 | 33.9% |
| HDW-1081 Hongtai Cabinet hinge 40mm | 1,100 22 ctn | AED 238.62 | 7% | AED 244,108.26 | 35.3% |
| Net | AED 971,146.02 | ||||
| VAT at 5% | AED 48,557.30 | ||||
| Total | AED 1,019,703.32 | ||||
| Margin on cost AED 669,220.53 | 31.1% | ||||
Revision history
2 revisions since the original.
- Rev 1 — Quantities revised on 3 lines after site measurement Nadia Farooq, 13 Mar 2026, 13:00AED 1,009,991.86
- Rev 2 — Unit price reduced on the sanitary lines Nadia Farooq, 16 Mar 2026, 13:00AED 1,048,837.70
Notes
Nothing noted against this quotation yet.
Terms
- Total
- AED 1,019,703.32
- Net
- AED 971,146.02
- VAT at 5%
- AED 48,557.30
- Valid until
- 9 Apr 2026
- Payment terms
- 90 days
- Incoterm
- DAP
- Lead time
- 3 days
Move it on
Marking a quotation won raises the sales order straight away and takes you to it.