PlummetFahad Al Mansoori

Where the container is

Eleven stages, each dated as it is reached (PU-06)

  1. PO placed21 Apr 2026
  2. PI received5 May 2026
  3. Advance paid19 May 2026
  4. In production2 Jun 2026
  5. Ready16 Jun 2026
  6. Stuffed30 Jun 2026
  7. Sailed14 Jul 2026
  8. ETA
  9. Arrived
  10. Cleared
  11. GRN
Next: ETA. Advancing records today's date, 31 Jul 2026, against it.

The voyage

What the forwarder has confirmed so far

Purchase order

PO-2026-0019

Containers

1 × 20 ft standard

Volume against the booking

29.062 of 33.2 CBM · 87.5%

Vessel

MSC Aurora

Bill of lading

BL/218745

ETD

20 Jul 2026

ETA

13 Sep 2026

Destination

Tema, Ghana

Trade type

Direct trade — never lands in the UAE

Documents

Five papers a container cannot clear without

The document checklist for this shipment, showing which papers are recorded and which are still missing.
DocumentWhat it is forRecorded asRecorded onBy
BLThe carrier's title to the goods — nothing is released without it.BL-SHP-2026-0042.pdf25 Jul 2026Chen Wei
Packing ListWhat is in each carton, checked against the container when it is unstuffed.Packing-List-SHP-2026-0042.pdf27 Jul 2026Chen Wei
Commercial InvoiceThe supplier's invoice, which customs values the duty against.Commercial-Invoice-SHP-2026-0042.pdf26 Jul 2026Chen Wei
COOCertificate of origin, needed for the preferential duty rate.COO-SHP-2026-0042.pdf28 Jul 2026Chen Wei
InsuranceThe marine cover certificate for the voyage.Missing
Customs DeclarationRaised by the clearing agent once the container has landed.Not raised yet

This build records the document by name only — there is no file store behind it yet.

Still to come: Insurance.

Landed cost worksheet

Freight, duty and clearing spread across the lines by weight (PU-08)

Fair when the container is weight-bound rather than volume-bound.

Charges are entered in AED because that is the currency the forwarder and the customs broker bill in, whatever the goods were bought in.

AED 5,332,372 of goods · AED 282,935 of charges · AED 5,615,307 landed

What each line now costs

The supplier price in AED, plus its share of the charges, against the item's current landed cost

Each line's share of the landed cost, with the new cost per piece against the item's current one.
ItemPiecesGoods (AED)ShareCharges (AED)New cost per pieceCurrent landed costMovement
FIT-1071 — Plummet Select End cap 110mm74042,531.224.8%13,538.5475.7770.078.1%
PLB-1012 — Peglar Pressure reducing valve 50mm4003,217.113.9%10,897.1335.299.80260.1%
SAN-1039 — Hongtai Shower tray 63mm8,250185,424.535.8%16,376.4224.4627.42-10.8%
PLB-1019 — Grohe Angle valve 63mm786141,125.148.8%24,808.47211.11218.96-3.6%
SAN-1026 — Kaiyuan Wall-hung WC 20mm4,675850,377.4721.4%60,485.20194.84221.84-12.2%
PLB-1024 — Peglar Stop cock 15mm9,9003,638,683.6238.3%108,471.48378.50448.22-15.6%
PLB-1006 — Peglar Gate valve 32mm3,216471,013.1117.1%48,357.77161.50178.59-9.6%
Total27,9675,332,372.20100%282,935.00
This is a direct trade, so these figures inform the margin on the deal. Nothing is written back onto the item master.

Goods received against this container

Raised in the warehouse when it is unstuffed

Photos from Pexels