Hongtai Y-strainer 63mm
Chinese factory from Guangzhou Everflow Pumps · 24 pcs per carton at 0.023 m³.
Reorder advice
Advisory — worked from twelve months of demand and this supplier's lead time
Order 6753 pcs of PLB-1015 now. At the current run rate this stocks out in month 1, and the lead time is 150 days.
961 pcs
1.0
6,753 pcs · between 5,943 and 7,563
High · ±12%
31 Jul 2026
-28% against the year's average
Item details
Master data behind every document this item appears on
Chinese factory
6819.31 · China
24 pcs · 32.7 × 27.1 × 26.3 cm
0.023 m³ — calculated from the dimensions.
31.29 kg gross · 25.07 kg net
AED 186.94 per piece
AED 296.73 · floor AED 203.76
37% default · 37.0% at list
615 pcs · 339 pcs held back
5 May 2026
31 Jul 2025 · Chen Wei
Twelve months of demand
Pieces sold each month, oldest first
15,118 pcs sold over the twelve months, an average of 961 pcs a month across the last six.