Edit purchase order
Supplier and terms
Chosen from the supplier record, and overtypeable line by line
Taken from the FX master. Fix it on the order if the bank gave a different rate.
What the supplier wants before production starts.
Sharjah Steel & Fixings quotes 7 days door to door.
The UK houses are ordered once each January and drawn down through the year (PU-04).
Lines
Pieces and cartons together, with the cubic metres each line adds
| Item | Pieces | Cartons | Unit cost (AED) | CBM | Line value (AED) | |
|---|---|---|---|---|---|---|
| 0.910 | 400,521.00 | |||||
| 2.691 | 227,295.60 | |||||
| 2.410 | 336,260.20 | |||||
| 0.312 | 30,219.84 | |||||
| 1.117 | 276,048.00 | |||||
| 1.641 | 160,428.24 | |||||
| 9.589 | 186,069.60 | |||||
| 3.439 | 1,375,935.00 | |||||
| 3.447 | 61,633.80 | |||||
| Total | 14,580 | 25.556 | 3,054,411.28 |
9 lines · AED 3,054,411.28 · AED 3,054,411.28 at 1.0000
Against the container
A planning aid on this form — the container itself is recorded on the shipment
Volume25.556 of 76.4 CBM · 33.5%
Weight16,033 of 26,460 kg · 60.6%
Weight is the binding constraint on this order. Open the load builder to work the fill up line by line.